Showing posts with label rudder. Show all posts
Showing posts with label rudder. Show all posts

Friday, January 9, 2015

Wa'apa Build - Part 38 (leeboard and rudder part 2)

Continuing leeboard and rudder construction...


The foil template used for shaping the boards

I cut the blank into pieces for rudder and leeboard so I could work on each individually...easier.



Lots of planing and sanding carefully to get to shape...




All shaped it gets a layer of glass for strength...then repeat for the rudder


In between glassing and fill coats of epoxy work on the aluminum plate which attaches to outside of leeboard.




Leeboard attaches to hull with a 1/2 inch / 12mm bolt. I used a 1 inch bit to drill the hole oversized first.

Sealed one side with packing tape..

And poured in some lightly thickened epoxy. When cured I scrape/sand it flush, then drill the 1/2 inch / 12mm hole through that. This keeps the wood safe from wear and water ingress..

Boards after fill coats of epoxy..awaiting sanding and several coats of spar urethane..or paint.



Also received my rudder pintles/gudgeons...

Along with lots of line and other hardware I've been collecting to get the boat rigged....


That's about it for now...to be continued....

Wa'apa Build - Part 37 (leeboard and rudder part 1)

The last big piece of the construction puzzle...the leeboard and rudder. I'm using the foil shape that Michael Storer specifies on his boats which requires me to create a very large blank exactly 22mm thick for shaping. With only my circular saw jig for ripping and hand planes for the dimensioning...I've been somewhat dreading this task knowing it will be a lot of labor and needs to be accurate. 

Luckily it seems I have gotten fairly good at dimensioning stock with hand tools, having done a fair amount of it now. Certainly saves a trip to the gym...

First step, prep the boards. Planing them smooth, mostly removing machine marks for good gluing surface.

And then ripping them all down to this. I need 22mm final thickness, but ripped staves to 30mm to give myself lots of wiggle room just in case things don't go smoothly at first. After arranging the staves how I thought best, was glued up to form the blank.

Once glue is cured out come the hand planes.

One face flattened, edges jointed, marking my 22mm thickness.

Then lots of work with and the hand planes and several piles of shavings later..

And all finished up at 22mm. A major workout but it worked out perfectly without any drama. Just keep the planes sharp and try to remember you (mostly) enjoy this..and at least you won't need a gym membership anytime soon!




Friday, August 23, 2013

Wa'apa Build - Part 18 (Rudder support installation)

Previously I had cut the timber for the rudder supports, and the holes in the hull to receive them...now it was time to make it permanent.

Supports carefully positioned and clamped in place.

Then screws driven through the bulkhead and into the supports. They are countersunk and will be left in place and filled over.

Then everything taken out, prepped as needed, and then glued in with thickened epoxy. The little spacer blocks were glued in to increase the gluing area and tie in to the bulkhead.

Fillets placed on outside.


That's that...on to the next bit...