Supports carefully positioned and clamped in place.
Then screws driven through the bulkhead and into the supports. They are countersunk and will be left in place and filled over.
Then everything taken out, prepped as needed, and then glued in with thickened epoxy. The little spacer blocks were glued in to increase the gluing area and tie in to the bulkhead.
Fillets placed on outside.
That's that...on to the next bit...
I'm enjoying your account of your build. I hope to do the same thing one day so it's good to get a feel of how it goes. Thanks
ReplyDelete